Skip to product information

Rogz Control Long Lead Black

Regular price $53.99
Sale price $53.99 Regular price
Colour

Product Details

Rogz designs pet products that improve the pet parenting experience. From interactive toys, to ergonomic bowls, and versatile walking accessories, Rogz offers a variety of useful products. This classic lead is designed with durable webbing, allowing for tight-stitchwork that resists damage. Strong enough to withstand even the worst pullers, this lead offers a comfortable 1.4 meters of length to play with.

Designed for versatile use, the lead comes with an accessory D-ring which can house your pets ID tag, or a waste bag holder. The reflective yarn woven into the material allows for increased visibility.

Key Features:

Durable Webbing - Tightly stitched Nylon webbing with high abrasion resistance, this lead will last a long time.
Reflective Stitching - Reflective Yarn woven into webbing and piping for night visibility.
Snap Hook - Corrosion-resistant zinc snap hook for convenient connection.
Waste Bag Holder - Accessory to hold your waste bags.
Accessory D-Ring - For ID tag attachment.

Size guide: XL 1.2 meters in length and 25mm width

Suitable for: Medium to Large sized dogs of all ages.